Year: 2011
• Foundations and structures
• Electrical installations
• Telecommunications
• Renewable and alternative energy
• Hydraulics systems
• Ventilation, extraction and air conditioning
• Gas networks
• Fire safety
• Elevators
• Special studies
BESA 70.000m2