Year: 2009 - 2010
Prize: Melhor Equipamento 2010

• Foundations
• Structures
• Electrical Installations
• Telecommunications
• Hydraulics systems
• Domestic wastewater and rainwater drainage systems
• Ventilation, extractions and air conditioning
• Gas networks
• Elevators
• Special Studies

 

Alves Ribeiro / Alrisa 20.000m2