Year: 2012
• Foundations and Structures
• Electrical Installations
• Telecommunications
• Safety
• Ventilation, extraction and air conditioning
• Hydraulics systems
• Acoustics
• Domestic wastewater and rainwater drainage systems
• Gas networks
• Thermal
GTRUCS 8700m2